voting results
voting results
2024년 6월 23일 13:30
Lifezone Metals Limited
Figure 2: Overview of the Kabanga site camp.
Figure 2: Overview of the Kabanga site camp.
6월 5일 15:00
Lifezone Metals Limited
Figure 1: Kabanga Nickel Project location in Tanzania.
Figure 1: Kabanga Nickel Project location in Tanzania.
6월 5일 15:00
Lifezone Metals Limited
Figure 4: Estimated project cash flows.
Figure 4: Estimated project cash flows.
6월 5일 15:00
Lifezone Metals Limited
Figure 6: Proposed mine design.
Figure 6: Proposed mine design.
6월 5일 15:00
Lifezone Metals Limited
Figure 7: Proposed mine design sequence (in years).
Figure 7: Proposed mine design sequence (in years).
6월 5일 15:00
Lifezone Metals Limited
Figure 9: Allocated refinery site at Kahama.
Figure 9: Allocated refinery site at Kahama.
6월 5일 15:00
Lifezone Metals Limited
Figure 10: Standard Gauge Railway locomotives in operation.
Figure 10: Standard Gauge Railway locomotives in operation.
6월 5일 15:00
Lifezone Metals Limited